Proposed Activities
:
- Casting Station, Clean and Non-extended: wharf with the length of 90 meters and a width of 255 m and a depth of 14 storage facilities and handling equipment.
Square area of 77 thousand m2 (estimated investment cost 1815 billion EGP).
- Building, Tourism and International Marina : establish a group of international hotels in addition to the Yacht Marina (estimated investment cost 6.6 billion EGP).
- Containers Terminal wharf 100: pier 90 meters and a length of 255 m.
- Polyester factory: a factory for the production of polyester on an area of 700 thousand m2 (Estimated Investment cost 1375 billion EGP)
- Multi-purpose Terminals: wharves with a length of 800 meters and a depth of 14 meters, opened and covered squares, storage facilities with an area of 250m2